The lift shaft is the vertical space in which the car and counterweight travel. Its parameters determine which lift can be installed at all, which is why every cost calculation starts with the shaft dimensions.
Three key dimensions
| Parameter | What it is |
|---|---|
| Plan dimensions | Internal width and depth of the shaft - these determine the car size |
| Pit | The recess below the lowest landing level - space for the buffers and the tensioning device |
| Headroom (top floor height) | The distance from the top landing to the ceiling slab above the shaft |
How much space a 450-1275 kg lift takes
Below are typical dimensions for the gearless machine-room-less MP GO lift at 1 m/s. Figures vary from model to model, so the table gives the order of magnitude: whether a 1000 kg lift is worth discussing for your shaft at all, or a 630 kg one is the better option.
| Rated load | Doors, clear opening | Shaft plan size | Pit | Headroom (top floor height) |
|---|---|---|---|---|
| 450-480 kg, 6 persons | 800 mm | from 1500 × 1500 mm | from 1025 mm | from 3400 mm |
| 630 kg, 8 persons | 900 mm | 1600 × 1650 mm | 1025 mm | 3400 mm |
| 1000 kg, 13 persons | 900 mm | from 1600 × 2350 mm | 1025 mm | 3400 mm |
| 1275 kg, 17 persons, hospital lift | 1000 mm | 1800 × 2700 mm | 1200 mm | 3400 mm |
Pit
Pit depth depends on the speed and type of lift. For a 1.0 m/s passenger lift it is roughly 1200-1400 mm, and less for modern gearless models: the same MP GO for 630 kg needs 1025 mm. Compact platform lifts may need a pit of 50-150 mm, and some models are installed with no pit at all, which is why they are often chosen when existing buildings are refurbished.
Headroom (top floor height)
A 1.0 m/s passenger lift needs about 3600-4000 mm above the top landing, while gearless machine-room-less models can manage with 3400 mm. If the height is not there, the options are models with reduced headroom or a hydraulic drive, which places lower demands on the top of the shaft.
Other considerations
- Ventilation of the shaft and machine room.
- Shaft and pit lighting, a socket outlet and switch in the pit.
- Embedded fixings in the floor slabs for mounting the guide rails.
- Pit waterproofing - especially in buildings with a high groundwater level.
- A dedicated power supply line with a circuit breaker.
What information to send the engineer
For a preliminary cost calculation, all we need is the internal plan dimensions of the shaft, the pit depth, the headroom height, the number of stops and floors, and the required rated load. If some of this information is missing, send what you have - the engineer will measure the rest on site during the survey.